Ganzebos

Project: Ganzebos project Place: Hengelo; The Netherlands Client: AkzoNobel End user: AkzoNobel   GFI was responsible for the realization of 3 new pomp stations in the area of Hengelo

2018-01-06T11:45:48+00:00

Phoenix | Singapore

Project: Phoenix I Place: Singapore Client: Boskalis End user: Boskalis System: Glandwatersystem During an inspection on board GFI and the client worked out the new routing of the new system. GFI worked out the engineering and isometrics. All required material was supplied by GFI.During a dry-dock in Singapore, the complete system was installed and tested.

2015-12-29T08:49:20+00:00

REN | Portugal

Project: REN Sines PlaceSines, Portugal Clien: Future Pipe Industries / TGE End user: REN  System: Coolingwater system GFI was responsible for the complete installation of two 1000 mm cooling water systems from the seawater intake to the Vaporizers. The total lenght installed,tested  & commissioned was 2 KM of pipeline.

2018-01-06T11:45:48+00:00

Cyrus | Abu Dhabi

Project : Replacement steel piping on board CSMD Cyrus Place: Abu Dhabi | United Emirates Client:  Boskalis End user:  Boskalis System:  Gland & Flush  During an inspection on board the CSMD Ursa the new system was planned , re-routed and all required material was calculated together with the client. GFI supplied the required Isometrics and took [...]

2015-12-29T08:51:47+00:00

Thames Water | UK

Project :  GRE piping for a new drinking water treatment plant in London | United Kingdom Client:  Future Pipe Industries B.V. | Acciona End user:  Thames Water System:  Seawater intake | Sandfilter Systems     GFI Installed with a team of ten pipefitters and a supervisor all the GRE systems including the supporting.After installation all systems were [...]

2018-01-06T11:45:48+00:00

Ursa | South Africa

Project: Replacement steel piping on board CSMD Ursa Plac:  Durban | South Africa Client:  Future Pipe Industries B.V. End user:  Boskalis System:  Gland & Flush | Main Coolingwater System    During an inspection on board the CSMD Ursa the new system was planned, re-routed and all required material was calculated together with the client. GFI carried out the [...]